Ecolighting UK helps CML premises10 January 2020
EcolightingUK has recently been specified for LED lighting at a 206,350ft2 warehouse at Brockton Business Park in Telford for CML, which stores and delivers a wide variety of food products across the ambient and chilled temperature ranges.
As part of its continued growth, CML expanded from its 75,000ft2 property on the Brockton site, which it leased in 2009, to assume full occupation of the 15-acre business park site in January 2012.
The logistics giant needed efficient lighting for its three chill warehouses, link tunnel and packing area and chose Ecolighting’s Pegasus LED high bay, Sapphire Linear and Altos emergency LED lighting for the installation.
The site was assessed by Ecolighting and 268 160W 120-degree beam angle Pegasus LEDs were selected for the three warehouses, with an added six for the link tunnel, 33 60W Sapphire LEDs were fitted in the packing area and Altos emergency lighting luminaires were also installed.
Robert White, group facilities manager at Culina Group, comments: “As part of some general improvements to the warehouse, we decided to switch to LED lighting to reduce our running costs. We chose to work with Ecolighting as we have worked with them for years and have always been impressed with their work and the savings we make. We are very pleased with the results.”
Adam Offord
This material is protected by MA Business copyright
See Terms and Conditions.
One-off usage is permitted but bulk copying is not.
For multiple copies
contact the sales team.