SPIE wins Calor filling site maintenance and upgrade contract 16 March 2021

Technical services firm SPIE UK has won a contract with Calor Gas for the long-term maintenance of the company’s Port Clarence facility, as well as the design and build of upgrades to the filling hall safety systems.

The filling site at Port Clarence is one of the main filling plants for Calor and is key to the nationwide operation of the UK’s leading LPG provider. Managing the safety of the site relies on monitoring all aspects of the cylinder filling process to ensure there is no gas buildup that could cause an incident.

SPIE UK has been appointed to complete the electrical and instrumentation cabling design, and installation for the LPG recovery ventilation control panel and the associated instruments inside the LPG recovery annex hall.

Electrical interlocks are used to ensure that the liquid recovery operation cannot take place unless the correct airflow is being delivered by the ventilation system. All of the equipment installed in the hazardous area is ATEX-certified in accordance with BSI BS EN 60079 Explosive Atmosphere regulations and is inspected by SPIE UK’s own CompEx trained operatives.

Operations Engineer

Related Companies
SPIE UK

This material is protected by MA Business copyright
See Terms and Conditions.
One-off usage is permitted but bulk copying is not.
For multiple copies contact the sales team.